Dripping Springs Southwest Connection Study Now Underway

Hays County is conducting a study to identify a route that will extend RM 150 from the intersection of RM 12 at RM 150 and connect to US 290 west of Dripping Springs. The purpose of this study is to plan ahead, so that Hays County can continue to improve transportation, safety, connectivity, and mobility and provide more options for travelers.

Why is the Study Needed?

  • Hays County is one of the fastest growing regions in the nation

  • It is anticipated that the population will increase by 267% by 2045, and that employment will increase by 221%. This will bring more cars and people to the area and increase congestion.

  • Hays County seeks to identify a path for a future roadway to add much-needed capacity south and west of Dripping Springs.

  • It is Hays County’s responsibility to plan proactively for transportation needs in the County to compliment the planning done by TxDOT and local governments.​

Study Goals

  • Study the area to identify a feasible footprint for a future roadway route, which considers current and future development

  • Coordinate with property owners and the community to share information on the study, receive input, and minimize impacts where possible

  • Plan ahead to help the County and other partners plan for budgeting, design and environmental considerations of a future roadway

Process

Through the Dripping Springs Southwest Connection Study, the County is working with local stakeholders and property owners to develop preliminary engineering plans (up to 20% design) for a future roadway. The intent is to minimize environmental impacts and impacts to property owners and to provide a safe, direct route between RM 12 and RM 150 southwest of Dripping Springs. The study will not include final design or construction plans.

Visit the project page to learn more, including timeline and FAQs! 